# Roading/Streets, 5, Carrs Road, Halswell, Canterbury, 8025, New Zealand

Halswell, Christchurch · filed 20 May 2020 · report 1089918
https://www.chch.live/report/1089918

> The road has dropped away significantly causing flooding every time it rains which blocks at least one lane of traffic. It is also difficult to remain on the correct side of the road due to the angle. Is it expected to be re-levelled?

*The reporter’s own words, a public report relayed, not verified or endorsed.*

## The council’s work orders, near this pin
- Road Asset (e.g.footpathroadfurniture), 0 m away · resolved 22 Jun 2020, took 5 weeks, probably the same job, filed through both doors
- Flooding (Road), 4 m away · resolved 14 Nov 2019, took 4 months
- Road Layout, 6 m away · resolved 15 Oct 2020, took 8 days
- Flooding (Road), 6 m away · resolved 8 Aug 2019, took 3 months
- Flooding (Road), 8 m away · resolved 8 Aug 2019, took 4 months
- Flooding (Road), 9 m away · resolved 1 Apr 2020, took 14 hours
- Pothole (Road), 10 m away · resolved 8 Jun 2021, took 22 hours
- Flooding (Road), 11 m away · resolved 26 May 2020, took 25 hours
MyCouncilTicket is a different door from the public report, one job can stand in both streams. The whole roll: https://www.chch.live/fixed

The problem: https://www.chch.live/problems/road-damage
The suburb: https://www.chch.live/wigram
The attached photograph: https://s3-ap-southeast-2.amazonaws.com/snapsendsolve-reports/images/01089918/1_WgiJda.jpg
What stood on this ground before: https://www.chch.live/before?lat=-43.561431883918026&lon=172.5499877927307

Data: https://api.chch.live/report?id=1089918
