# Wastewater/Stormwater, 62 Cressy Terrace, Corsair Bay 8082, New Zealand

Corsair Bay, Christchurch · filed 1 June 2020 · report 1102558
https://www.chch.live/report/1102558

> Drain looks blocked and overflowing

*The reporter’s own words, a public report relayed, not verified or endorsed.*

## The council’s work orders, near this pin
- Blockage (Waste/Storm/Waterway), 0 m away · resolved 25 Jun 2020, took 3 weeks, probably the same job, filed through both doors
- Temporary Traffic Management, 7 m away · resolved 31 Jan 2022, took 3 weeks
- Temporary Traffic Management, 11 m away · resolved 10 Feb 2021, took 25 hours
- Water Meter Box & Parts, 11 m away · resolved 17 Jun 2019, took 7 weeks
- Grass (Road), 12 m away · open, filed 27 Nov 2018
- Leak (Water Supply), 12 m away · resolved 20 Jun 2019, took 5 weeks
- Leak (Water Supply), 13 m away · resolved 1 Jun 2022, took 6 days
- Blocked drain pipe or waterway (Road), 13 m away · resolved 2 Aug 2021, took 2 weeks
MyCouncilTicket is a different door from the public report, one job can stand in both streams. The whole roll: https://www.chch.live/fixed

The problem: https://www.chch.live/problems/stormwater
The street: https://www.chch.live/street/corsair-bay/cressy-terrace
The address: https://www.chch.live/corsair-bay/62-cressy-terrace
The suburb: https://www.chch.live/corsair-bay
The attached photograph: https://s3-ap-southeast-2.amazonaws.com/snapsendsolve-reports/images/01102558/1_BzlCqR.jpg
What stood on this ground before: https://www.chch.live/before?lat=-43.608612059236656&lon=172.70195007274154

Data: https://api.chch.live/report?id=1102558
