# Roading/Streets, Christchurch Northern Motorway, Belfast, Canterbury, 8083, New Zealand

Belfast, Christchurch · filed 22 June 2020 · report 1125999
https://www.chch.live/report/1125999

> The pot holes on the bridge need to be fixed before someone loses it on the bridge. The 50km per hour rough surface signage isn’t working as it’s been in place for to long and it’s just normal conditions we have come accustomed to on Christchurch roads.

*The reporter’s own words, a public report relayed, not verified or endorsed.*

## The council’s work orders, near this pin
- Pothole (Road), 9 m away · resolved 22 Jun 2020, took 8 min, probably the same job, filed through both doors
- Pothole (Road), 10 m away · resolved 22 Jun 2020, took 5 hours, probably the same job, filed through both doors
- Bridge, 9 m away · resolved 6 Jun 2023, took 3 hours
- Bridge, 15 m away · resolved 21 Feb 2025, took 6 hours
- Footpath, 16 m away · resolved 20 Feb 2024, took 1 hours
- Pothole (Road), 16 m away · resolved 5 May 2020, took 8 min
- Pothole (Road), 16 m away · resolved 14 Jun 2019, took 2 hours
- Bridge, 18 m away · resolved 3 Feb 2024, took 8 min
MyCouncilTicket is a different door from the public report, one job can stand in both streams. The whole roll: https://www.chch.live/fixed

The problem: https://www.chch.live/problems/road-damage
The street: https://www.chch.live/street/belfast/northern-motorway
The suburb: https://www.chch.live/belfast
What stood on this ground before: https://www.chch.live/before?lat=-43.41521835246201&lon=172.64666747986055

Data: https://api.chch.live/report?id=1125999
