# Roading/Streets

Christchurch · filed 29 January 2016 · report 116135
https://www.chch.live/report/116135

> The laying of UFB cables in the footpath by Vodafone contractors has affected my vehicle crossing, there is now a significant mismatch and drop off to access my property. This is the second submission I have made with no response! The suspension of my vehicles is being stressed by the poor remediation works when the footpath was repaired by the contractors.

*The reporter’s own words, a public report relayed, not verified or endorsed.*

## The council’s work orders, near this pin
- Hazard/Object in Road, 0 m away · resolved 10 Dec 2024, took 9 days
- Safety Improvements, 6 m away · resolved 28 Mar 2025, took 6 weeks
- Road Layout, 7 m away · resolved 12 Feb 2021, took 3 months
- Blockage/Water Not Draining, 7 m away · resolved 18 Jul 2025, took 3 days
- Road Asset (e.g.footpathroadfurniture), 8 m away · resolved 17 Sept 2019, took 4 days
- Spillage - e.g. Fuel Chemicals (Road), 9 m away · resolved 26 Feb 2019, took 16 hours
- Blocked drain pipe or waterway (Road), 9 m away · resolved 2 Nov 2021, took 5 weeks
- Blockage/Water Not Draining, 11 m away · resolved 20 Feb 2024, took 4 weeks
MyCouncilTicket is a different door from the public report, one job can stand in both streams. The whole roll: https://www.chch.live/fixed

The problem: https://www.chch.live/problems/road-damage
The suburb: https://www.chch.live/cashmere
The attached photograph: https://s3-ap-southeast-2.amazonaws.com/snapsendsolve-reports/images/00116135/0
What stood on this ground before: https://www.chch.live/before?lat=-43.575116666049794&lon=172.6251133949768

Data: https://api.chch.live/report?id=116135
