# Water Supply, 26, Rossmore Terrace, Cashmere, Canterbury, 8022, New Zealand

Cashmere, Christchurch · filed 23 August 2020 · report 1196659
https://www.chch.live/report/1196659

> Water bubbling out

*The reporter’s own words, a public report relayed, not verified or endorsed.*

## The council’s work orders, near this pin
- Leak (Water Supply), 3 m away · resolved 24 Aug 2020, took 18 hours, probably the same job, filed through both doors
- Council Sewer, 9 m away · resolved 23 Aug 2020, took 2 hours, probably the same job, filed through both doors
- Leak (Water Supply), 40 m away · resolved 14 Sept 2020, took 3 weeks, probably the same job, filed through both doors
- Potholes, 2 m away · resolved 9 Jan 2023, took 4 days
- Potholes, 3 m away · resolved 10 May 2023, took 5 days
- Litter (Road), 3 m away · resolved 12 May 2022, took 26 hours
- Leak (Water Supply), 6 m away · resolved 11 Dec 2018, took 33 hours
- Blockage/Water Not Draining, 7 m away · resolved 26 Mar 2025, took 23 hours
MyCouncilTicket is a different door from the public report, one job can stand in both streams. The whole roll: https://www.chch.live/fixed

The problem: https://www.chch.live/problems/water-leaks
The street the pin lands nearest: https://www.chch.live/street/cashmere/rossmore-terrace
The filed address the pin lands 2 m from: https://www.chch.live/cashmere/16a-rossmore-terrace
The suburb: https://www.chch.live/cashmere
The attached photograph: https://s3-ap-southeast-2.amazonaws.com/snapsendsolve-reports/images/01196659/1_OtWdAW.jpg
What stood on this ground before: https://www.chch.live/before?lat=-43.57042312538696&lon=172.63629150430162

Data: https://api.chch.live/report?id=1196659
