# Roading/Streets, New Brighton, Canterbury, 8061, New Zealand

Christchurch · filed 5 September 2020 · report 1212886
https://www.chch.live/report/1212886

> Massive potholes on bridge approach as result of roadworks- cars will get damaged

*The reporter’s own words, a public report relayed, not verified or endorsed.*

## The council’s work orders, near this pin
- Traffic Light, 27 m away · resolved 2 Sept 2020, took 10 hours, probably the same job, filed through both doors
- Road Asset (e.g.footpathroadfurniture), 27 m away · resolved 7 Sept 2020, took 3 days, probably the same job, filed through both doors
- Road Works, 28 m away · resolved 8 Sept 2020, took 48 hours, probably the same job, filed through both doors
- Graffiti on Utility box, 1 m away · resolved 29 Jul 2021, took 18 hours
- Graffiti, 1 m away · resolved 24 Feb 2021, took 22 hours
- Graffiti (OLD), 2 m away · resolved 17 Feb 2024, took 25 hours
- Flooding (Waste/Storm/Waterway), 3 m away · resolved 13 Jul 2022, took 21 hours
- Graffiti, 4 m away · resolved 4 Aug 2020, took 30 hours
MyCouncilTicket is a different door from the public report, one job can stand in both streams. The whole roll: https://www.chch.live/fixed

The problem: https://www.chch.live/problems/road-damage
The street: https://www.chch.live/street/avondale/brighton
The suburb: https://www.chch.live/avondale
The attached photograph: https://s3-ap-southeast-2.amazonaws.com/snapsendsolve-reports/images/01212886/1_FWDK3A.jpg
What stood on this ground before: https://www.chch.live/before?lat=-43.50333785953283&lon=172.70779419001934

Data: https://api.chch.live/report?id=1212886
