# Playground Equipment, 171, Armagh Street, Christchurch, Canterbury, 8011, New Zealand

Christchurch · filed 21 September 2020 · report 1231216
https://www.chch.live/report/1231216

> The control valve in the pump room has developed a slow leak in the deal between the top and bottom of valve in attachment. This morning the water feature water pressure is very low for some reason.. This was ok yesterday..

*The reporter’s own words, a public report relayed, not verified or endorsed.*

## The council’s work orders, near this pin
- Clean a Council Facility (Park), 24 m away · resolved 17 Sept 2020, took 18 hours, probably the same job, filed through both doors
- General Maintenance (Parks), 44 m away · resolved 16 Sept 2020, took 42 hours, probably the same job, filed through both doors
- Blockage (Park), 44 m away · resolved 6 Oct 2020, took 13 days, probably the same job, filed through both doors
- Leak (Park), 0 m away · resolved 6 Oct 2020, took 2 weeks
- Playground (Park), 3 m away · resolved 19 Mar 2020, took 5 weeks
- Playground (Park), 3 m away · resolved 11 Apr 2022, took 24 hours
- Graffiti - Fence, building or structure, 4 m away · resolved 9 Sept 2026, took 15 hours
- Spillage Non Toxic, 4 m away · resolved 5 Dec 2025, took 6 weeks
MyCouncilTicket is a different door from the public report, one job can stand in both streams. The whole roll: https://www.chch.live/fixed

The problem: https://www.chch.live/problems/parks-maintenance
The suburb: https://www.chch.live/christchurch-central-city
The attached photograph: https://s3-ap-southeast-2.amazonaws.com/snapsendsolve-reports/images/01231216/1_oCHdgX.jpg
What stood on this ground before: https://www.chch.live/before?lat=-43.528533934695226&lon=172.64062499987338

Data: https://api.chch.live/report?id=1231216
