# Wastewater/Stormwater, 124, Wordsworth Street, Sydenham, 8023, Canterbury

Sydenham, Christchurch · filed 9 March 2016 · report 126005
https://www.chch.live/report/126005

> Concrete company (Shearings) have blocked the stormwater drain with run off from concrete works. Car park flooding

*The reporter’s own words, a public report relayed, not verified or endorsed.*

## The council’s work orders, near this pin
- Graffiti on Utility box, 19 m away · open, filed 16 Apr 2019
- Leak (Water Supply), 20 m away · resolved 23 Jul 2019, took 2 weeks
- Abandoned Vehicles, 22 m away · resolved 29 Dec 2023, took 7 months
- Graffiti - Utility box, pole, railway, 25 m away · resolved 29 Dec 2025, took 41 hours
- Water Leak, 27 m away · resolved 26 Feb 2026, took 4 weeks
- Leak (Water Supply), 27 m away · resolved 27 May 2021, took 46 hours
- Signs, 28 m away · resolved 20 Jun 2024, took 10 days
- Wandering dog, 31 m away · resolved 17 Jul 2022, took 2 hours
MyCouncilTicket is a different door from the public report, one job can stand in both streams. The whole roll: https://www.chch.live/fixed

The problem: https://www.chch.live/problems/stormwater
The street the pin lands nearest: https://www.chch.live/street/sydenham/wordsworth-street
The filed address the pin lands 20 m from: https://www.chch.live/sydenham/124-wordsworth-street
The suburb: https://www.chch.live/sydenham
The attached photograph: https://s3-ap-southeast-2.amazonaws.com/snapsendsolve-reports/images/00126005/0
What stood on this ground before: https://www.chch.live/before?lat=-43.54498006349326&lon=172.64056990889148

Data: https://api.chch.live/report?id=126005
