# Pavement - General, 19 Amyes Road, Canterbury 8042, New Zealand

Christchurch · filed 24 October 2020 · report 1277135
https://www.chch.live/report/1277135

> Pedestrian rail down yellow

*The reporter’s own words, a public report relayed, not verified or endorsed.*

## The council’s work orders, near this pin
- Road Asset (e.g.footpathroadfurniture), 2 m away · resolved 11 Mar 2021, took 5 months, probably the same job, filed through both doors
- Road Asset (e.g.footpathroadfurniture), 41 m away · resolved 10 Mar 2021, took 5 months, probably the same job, filed through both doors
- Flooding, 0 m away · resolved 28 Jan 2025, took 42 hours
- Vehicle, 1 m away · resolved 5 Sept 2019, took 41 hours
- Road Asset (e.g.footpathroadfurniture), 5 m away · resolved 13 Jul 2020, took 21 hours
- Blocked drain pipe or waterway (Road), 5 m away · resolved 8 Jun 2022, took 5 days
- Blockage/Water Not Draining, 5 m away · resolved 13 Mar 2023, took 11 min
- Flooding, 5 m away · resolved 27 Jan 2025, took 12 hours
MyCouncilTicket is a different door from the public report, one job can stand in both streams. The whole roll: https://www.chch.live/fixed

The problem: https://www.chch.live/problems/footpaths
The street: https://www.chch.live/street/hornby/amyes-road
The address: https://www.chch.live/hornby/19-amyes-road
The suburb: https://www.chch.live/hornby
The attached photograph: https://s3-ap-southeast-2.amazonaws.com/snapsendsolve-reports/images/01277135/1_rfqLso.jpg
What stood on this ground before: https://www.chch.live/before?lat=-43.54648617703343&lon=172.52671793074362

Data: https://api.chch.live/report?id=1277135
