# Roading/Streets, 72 Wiggins St, Sumner, Christchurch 8081, New Zealand

Sumner, Christchurch · filed 14 April 2016 · report 134317
https://www.chch.live/report/134317

> 30kph signs hidden when entering zone from east

*The reporter’s own words, a public report relayed, not verified or endorsed.*

## The council’s work orders, near this pin
- Water Leak, 19 m away · resolved 22 Feb 2024, took 2 weeks
- Leak (Water Supply), 19 m away · resolved 22 Oct 2021, took 7 days
- Water Leak, 25 m away · resolved 8 Jan 2024, took 2 weeks
- Abandoned Vehicles, 27 m away · resolved 4 Sept 2025, took 14 days
- Contractor Damage, 29 m away · resolved 18 Jan 2022, took 4 weeks
- Road Asset (e.g.footpathroadfurniture), 30 m away · resolved 2 May 2019, took 7 months
- Blocked drain pipe or waterway (Road), 32 m away · resolved 23 Nov 2020, took 15 months
- Water Leak, 32 m away · resolved 7 Aug 2023, took 7 days
MyCouncilTicket is a different door from the public report, one job can stand in both streams. The whole roll: https://www.chch.live/fixed

The problem: https://www.chch.live/problems/road-damage
The street: https://www.chch.live/street/sumner/wiggins-street
The address: https://www.chch.live/sumner/72-wiggins-street
The suburb: https://www.chch.live/sumner
What stood on this ground before: https://www.chch.live/before?lat=-43.5744753994665&lon=172.76488390007464

Data: https://api.chch.live/report?id=134317
