# Water Leak, Tunnel Road, Canterbury 8023, New Zealand

Christchurch · filed 22 February 2021 · report 1454131
https://www.chch.live/report/1454131

> water pipe leaking under bridge

*The reporter’s own words, a public report relayed, not verified or endorsed.*

## The council’s work orders, near this pin
- Leak (Water Supply), 7 m away · resolved 9 Mar 2021, took 3 weeks, probably the same job, filed through both doors
- Leak (Water Supply), 17 m away · resolved 24 Feb 2021, took 20 hours, probably the same job, filed through both doors
- Leak (Water Supply), 23 m away · resolved 3 Mar 2021, took 2 weeks, probably the same job, filed through both doors
- Leak (Water Supply), 24 m away · resolved 1 Mar 2021, took 44 hours, probably the same job, filed through both doors
- Leak (Water Supply), 52 m away · resolved 26 Feb 2021, took 20 hours, probably the same job, filed through both doors
- General Maintenance (Parks), 0 m away · resolved 18 Feb 2021, took 47 hours
- General Maintenance (Parks), 1 m away · resolved 20 Apr 2021, took 3 days
- Graffiti - Road, footpath or bridge, 1 m away · resolved 29 Sept 2026, took 3.5 years
MyCouncilTicket is a different door from the public report, one job can stand in both streams. The whole roll: https://www.chch.live/fixed

The problem: https://www.chch.live/problems/water-leaks
The suburb: https://www.chch.live/ferrymead
The attached photograph: https://s3-ap-southeast-2.amazonaws.com/snapsendsolve-reports/images/01454131/1_v9wPpI.jpg
What stood on this ground before: https://www.chch.live/before?lat=-43.55481049872178&lon=172.69124360058643

Data: https://api.chch.live/report?id=1454131
