# Wastewater/Stormwater, 34, Stewart Street, Christchurch, 8011, Canterbury

Christchurch · filed 7 July 2016 · report 154364
https://www.chch.live/report/154364

> Metro sports are increasing storm water loading on Stewart St, and have been asked to increase storm water pipes size past from Balfour St. Past our property and part way down Stewart St. Given that there is flooding in moderate rain events already at the corner of Stewart and St Asaph, what plans do Council have to take the extra loading into this stormwater drain which appears overloaded and thus one could presumably expect even more flooding? Bob Parker.

*The reporter’s own words, a public report relayed, not verified or endorsed.*

## The council’s work orders, near this pin
- Water Supply, 6 m away · resolved 27 Jan 2025, took 1 hours
- Litter, 6 m away · resolved 25 Feb 2025, took 3 weeks
- Safety Improvements, 7 m away · resolved 27 Aug 2025, took 3 weeks
- Graffiti - Fence, building or structure, 9 m away · resolved 16 Jul 2025, took 45 hours
- Leak (Water Supply), 11 m away · resolved 3 Nov 2020, took 2 hours
- Street Light, 13 m away · resolved 1 Jul 2020, took 5 days
- Garden (Road), 20 m away · resolved 23 Apr 2021, took 26 hours
- Meter box, 22 m away · resolved 28 Jan 2025, took 4 days
MyCouncilTicket is a different door from the public report, one job can stand in both streams. The whole roll: https://www.chch.live/fixed

The problem: https://www.chch.live/problems/stormwater
The suburb: https://www.chch.live/christchurch-central-city
What stood on this ground before: https://www.chch.live/before?lat=-43.53821499879584&lon=172.62470799971751

Data: https://api.chch.live/report?id=154364
