# Wastewater/Stormwater, 2, Dawe Street, Mairehau, Canterbury, 8013, New Zealand

Mairehau, Christchurch · filed 12 May 2021 · report 1580359
https://www.chch.live/report/1580359

> The first drain on Akaroa Street/ corner Dawe Street, was covered for road works in March, is still covered. The second drain infront of 2 Dawe Street takes water from Akaroa Street and it floods out on to Dawe Street. Overnight the force of water raised the grating.

*The reporter’s own words, a public report relayed, not verified or endorsed.*

## The council’s work orders, near this pin
- Leak (Water Supply), 7 m away · resolved 15 Jun 2020, took 6 hours
- Blocked drain pipe or waterway (Road), 7 m away · resolved 29 Dec 2020, took 13 days
- Leak (Water Supply), 7 m away · resolved 11 Mar 2021, took 4 days
- Litter (Road), 8 m away · resolved 4 Mar 2020, took 22 hours
- Blocked drain pipe or waterway (Road), 9 m away · resolved 4 Feb 2020, took 11 days
- Blocked drain pipe or waterway (Road), 9 m away · resolved 17 May 2021, took 5 days
- Sweeping, 10 m away · resolved 1 Feb 2023, took 14 days
- Blocked drain pipe or waterway (Road), 10 m away · resolved 7 Aug 2019, took 5 days
MyCouncilTicket is a different door from the public report, one job can stand in both streams. The whole roll: https://www.chch.live/fixed

The problem: https://www.chch.live/problems/stormwater
The street the pin lands nearest: https://www.chch.live/street/mairehau/dawe-street
The filed address the pin lands 2 m from: https://www.chch.live/mairehau/2-dawe-street
The suburb: https://www.chch.live/mairehau
The attached photograph: https://s3-ap-southeast-2.amazonaws.com/snapsendsolve-reports/images/01580359/1_6UGC87.jpg
What stood on this ground before: https://www.chch.live/before?lat=-43.498600004931085&lon=172.65199279823932

Data: https://api.chch.live/report?id=1580359
