# Roading/Streets, 127, Awatea Road, Halswell, Canterbury, 8025, New Zealand

Halswell, Christchurch · filed 7 June 2021 · report 1619952
https://www.chch.live/report/1619952

> Road by the gutter eroding

*The reporter’s own words, a public report relayed, not verified or endorsed.*

## The council’s work orders, near this pin
- Pothole (Road), 0 m away · resolved 8 Jun 2021, took 23 hours, probably the same job, filed through both doors
- Pothole (Road), 54 m away · resolved 8 Jun 2021, took 22 hours, probably the same job, filed through both doors
- Road Asset (e.g.footpathroadfurniture), 56 m away · resolved 9 Jun 2021, took 43 hours, probably the same job, filed through both doors
- Potholes, 4 m away · resolved 16 Aug 2022, took 40 hours
- Signs, 4 m away · open, filed 26 May 2023
- Road Layout, 4 m away · resolved 4 Dec 2020, took 22 hours
- Potholes, 5 m away · resolved 13 Oct 2025, took 3 days
- Grass, 8 m away · resolved 13 Feb 2025, took 13 months
MyCouncilTicket is a different door from the public report, one job can stand in both streams. The whole roll: https://www.chch.live/fixed

The problem: https://www.chch.live/problems/road-damage
The suburb: https://www.chch.live/wigram
The attached photograph: https://s3-ap-southeast-2.amazonaws.com/snapsendsolve-reports/images/01619952/1_nw7hxt.jpg
What stood on this ground before: https://www.chch.live/before?lat=-43.560886382462726&lon=172.5502624515229

Data: https://api.chch.live/report?id=1619952
