# Wastewater/Stormwater, 17, Hood Street, New Brighton, Canterbury, 8061, New Zealand

New Brighton, Christchurch · filed 29 August 2021 · report 1757834
https://www.chch.live/report/1757834

> Gutter blocked from gravel left by roadworks. South East Cnr Oram Ave and Hood St

*The reporter’s own words, a public report relayed, not verified or endorsed.*

## The council’s work orders, near this pin
- Litter (Road), 0 m away · resolved 3 Sept 2021, took 5 days, probably the same job, filed through both doors
- Flooding, 4 m away · resolved 24 Nov 2022, took 5 days
- Blocked drain pipe or waterway (Road), 4 m away · resolved 17 Sept 2021, took 26 hours
- Blockage/Water Not Draining, 5 m away · resolved 25 Jul 2023, took 2 days
- Flooding, 6 m away · resolved 13 Jul 2023, took 4 days
- Flooding, 7 m away · resolved 17 Aug 2023, took 16 hours
- Graffiti (OLD), 8 m away · resolved 1 Mar 2024, took 22 hours
- Channel/Kerb/Culvert, 8 m away · resolved 11 Oct 2023, took 12 days
MyCouncilTicket is a different door from the public report, one job can stand in both streams. The whole roll: https://www.chch.live/fixed

The problem: https://www.chch.live/problems/stormwater
The street the pin lands nearest: https://www.chch.live/street/new-brighton/hood-street
The filed address the pin lands 3 m from: https://www.chch.live/new-brighton/17-hood-street
The suburb: https://www.chch.live/new-brighton
The attached photograph: https://s3-ap-southeast-2.amazonaws.com/snapsendsolve-reports/images/01757834/1_oDmFXI.jpg
What stood on this ground before: https://www.chch.live/before?lat=-43.50982284490169&lon=172.7305603021465

Data: https://api.chch.live/report?id=1757834
