# Water Supply, 3C Taylors Avenue, Bryndwr, Christchurch 8052, New Zealand

Bryndwr, Christchurch · filed 10 September 2021 · report 1786200
https://www.chch.live/report/1786200

> Toby not working properly and small leak

*The reporter’s own words, a public report relayed, not verified or endorsed.*

## The council’s work orders, near this pin
- Leak (Water Supply), 70 m away · resolved 22 Sept 2021, took 12 days, probably the same job, filed through both doors
- Road Asset (e.g.footpathroadfurniture), 41 m away · resolved 28 Apr 2022, took 29 hours
- Sweeping, 48 m away · resolved 22 Jun 2023, took 10 days
- Signs, 48 m away · resolved 11 Apr 2024, took 5 months
- Blockage/Water Not Draining, 49 m away · resolved 28 Nov 2023, took 7 weeks
- Flooding (Road), 50 m away · resolved 24 Jan 2020, took 9 months
- Blocked drain pipe or waterway (Road), 51 m away · resolved 8 Aug 2019, took 3 months
- Flooding (Road), 51 m away · resolved 30 Dec 2021, took 20 months
MyCouncilTicket is a different door from the public report, one job can stand in both streams. The whole roll: https://www.chch.live/fixed

The problem: https://www.chch.live/problems/water-leaks
The street: https://www.chch.live/street/bryndwr/taylors-avenue
The address: https://www.chch.live/bryndwr/3c-taylors-avenue
The suburb: https://www.chch.live/bryndwr
The attached photograph: https://s3-ap-southeast-2.amazonaws.com/snapsendsolve-reports/images/01786200/1_wOSCdF.jpg
What stood on this ground before: https://www.chch.live/before?lat=-43.50965629864225&lon=172.601251000045

Data: https://api.chch.live/report?id=1786200
