# Flooding, Stanmore Road, Canterbury 8011, New Zealand

Christchurch · filed 6 December 2021 · report 1993739
https://www.chch.live/report/1993739

> These flooding issues have been ongoing since 2011 earthquake.

*The reporter’s own words, a public report relayed, not verified or endorsed.*

## The council’s work orders, near this pin
- Blocked drain pipe or waterway (Road), 0 m away · resolved 16 Dec 2021, took 10 days, probably the same job, filed through both doors
- Water Meter Box & Parts, 4 m away · resolved 15 Dec 2021, took 6 days, probably the same job, filed through both doors
- Water Meter Box & Parts, 40 m away · resolved 9 Dec 2021, took 7 days, probably the same job, filed through both doors
- Leak (Water Supply), 65 m away · resolved 3 Dec 2021, took 3 hours, probably the same job, filed through both doors
- Flooding (Road), 0 m away · resolved 18 May 2022, took 10 days
- Graffiti on Utility box, 0 m away · resolved 28 Jan 2021, took 6 hours
- Channel/Kerb/Culvert, 1 m away · resolved 2 Apr 2024, took 12 months
- Graffiti, 2 m away · resolved 20 Jan 2021, took 37 hours
MyCouncilTicket is a different door from the public report, one job can stand in both streams. The whole roll: https://www.chch.live/fixed

The problem: https://www.chch.live/problems/flooding
The suburb: https://www.chch.live/phillipstown
The attached photograph: https://s3-ap-southeast-2.amazonaws.com/snapsendsolve-reports/images/01993739/1_IV6pip.jpg
What stood on this ground before: https://www.chch.live/before?lat=-43.533231399080435&lon=172.65718760053417

Data: https://api.chch.live/report?id=1993739