# Water Leak, 147 Clarendon Terrace, Canterbury, New Zealand

Christchurch · filed 3 January 2022 · report 2047947
https://www.chch.live/report/2047947

> Was on a run and noticed a recent looking pipe repair (new asphalt square on road) was leaking through edges of repair. River was in high tide, so I suspect it was from a stormwater repair when the river water goes back up through sump outlet at high tide. Get contractor back out there to repair properly.

*The reporter’s own words, a public report relayed, not verified or endorsed.*

## The council’s work orders, near this pin
- Leak (Water Supply), 0 m away · resolved 5 Jan 2022, took 2 days, probably the same job, filed through both doors
- Graffiti, 1 m away · resolved 18 Aug 2019, took 2 hours
- Blockage/Water Not Draining, 1 m away · resolved 31 Oct 2022, took 8 hours
- Blockage/Water Not Draining, 2 m away · resolved 22 Nov 2023, took 5 days
- Flooding, 2 m away · resolved 11 Sept 2026, took 6 hours
- Flooding, 3 m away · resolved 30 Apr 2025, took 21 min
- Graffiti, 3 m away · resolved 31 Mar 2022, took 6 months
- Litter, 3 m away · resolved 7 Nov 2023, took 4 days
MyCouncilTicket is a different door from the public report, one job can stand in both streams. The whole roll: https://www.chch.live/fixed

The problem: https://www.chch.live/problems/water-leaks
The street: https://www.chch.live/street/hillsborough/clarendon-terrace
The address: https://www.chch.live/hillsborough/147-clarendon-terrace
The suburb: https://www.chch.live/hillsborough
What stood on this ground before: https://www.chch.live/before?lat=-43.55310331104777&lon=172.66763683395263

Data: https://api.chch.live/report?id=2047947
