# Flooding, Lavericks Road, Le Bons Bay, Canterbury, 7583, New Zealand

Le Bons Bay, Christchurch · filed 14 March 2022 · report 2218000
https://www.chch.live/report/2218000

> Entrance to culvert has been opened but culvert is still 70% blocked and needs cleaning out. The current opening is not sufficient to allow water to drain away during wet weather. Rubble that was dug out had been placed above culvert this will wash down back into culvert during wet weather repeating the same previous problem

*The reporter’s own words, a public report relayed, not verified or endorsed.*

## The council’s work orders, near this pin
- Blocked drain pipe or waterway (Road), 0 m away · resolved 2 May 2022, took 9 weeks
- Road Asset (e.g.footpathroadfurniture), 2 m away · resolved 10 Apr 2019, took 9 days
MyCouncilTicket is a different door from the public report, one job can stand in both streams. The whole roll: https://www.chch.live/fixed

The problem: https://www.chch.live/problems/flooding
The suburb: https://www.chch.live/le-bons-bay
The attached photograph: https://snapsendsolve-reports.s3.ap-southeast-2.amazonaws.com/images/02218000/public/1_QkewdKc.jpg
What stood on this ground before: https://www.chch.live/before?lat=-43.72977065917218&lon=173.0903930665103

Data: https://api.chch.live/report?id=2218000
