# Water Leak, 9 Ngahere Street, Fendalton, Christchurch 8041, New Zealand

Fendalton, Christchurch · filed 12 April 2022 · report 2285928
https://www.chch.live/report/2285928

> Kia ora, No water again today. Third time in less than a week. Please replace the 1940 asbestos pipes in our street, this is the third time we have had pipes blow out. Patch up jobs are not enough as the road asphalt is so badly cracked as well, the water leaks just further up the chain due to pressure. Do the job once do it properly. Having water care men come and go repeatedly is saving at the wrong end. Must cost CCC x4 what it would have cost to do whole street Nghahere is a little forgotten about side street, with loads of traffic, pedestrians and cyclists entering exiting Riccarton House. I counted x5 walkers and cyclists attempting to walk through Riccarton House last night, which had closed its gates, when I was out washing all the mud away. Nga mihi Shelley.beckert@xtra.co.nz

*The reporter’s own words, a public report relayed, not verified or endorsed.*

## Also at this address (one of 7)
- [Street Gutters / Storm Water](https://www.chch.live/report/4811530), 23 Jun 2024
- [Roading/Streets](https://www.chch.live/report/2308715), 23 Apr 2022
- [Roading/Streets](https://www.chch.live/report/1686819), 19 Jul 2021
- [Roading/Streets](https://www.chch.live/report/1675728), 12 Jul 2021
- [Roading/Streets](https://www.chch.live/report/1658191), 1 Jul 2021
- [Water Supply](https://www.chch.live/report/358608), 23 Jan 2018
- [The address’s whole record](https://www.chch.live/fendalton/9-ngahere-street)

## The council’s work orders, near this pin
- Leak (Water Supply), 27 m away · resolved 19 Apr 2022, took 6 days, probably the same job, filed through both doors
- Water Supply, 31 m away · open, filed 7 Apr 2022, probably the same job, filed through both doors
- Leak (Water Supply), 32 m away · resolved 5 May 2022, took 4 weeks, probably the same job, filed through both doors
- Leak (Water Supply), 32 m away · resolved 28 Apr 2022, took 2 weeks, probably the same job, filed through both doors
- Leak (Water Supply), 33 m away · resolved 27 Apr 2022, took 2 weeks, probably the same job, filed through both doors
- Leak (Water Supply), 40 m away · resolved 26 May 2022, took 7 weeks, probably the same job, filed through both doors
- Leak (Water Supply), 57 m away · resolved 8 Apr 2022, took 9 hours, probably the same job, filed through both doors
- Water Leak, 71 m away · resolved 20 Jun 2024, took 2.2 years, probably the same job, filed through both doors
MyCouncilTicket is a different door from the public report, one job can stand in both streams. The whole roll: https://www.chch.live/fixed

The problem: https://www.chch.live/problems/water-leaks
The street: https://www.chch.live/street/fendalton/ngahere-street
The address: https://www.chch.live/fendalton/9-ngahere-street
The suburb: https://www.chch.live/fendalton
The attached photograph: https://s3-ap-southeast-2.amazonaws.com/snapsendsolve-reports/images/02285928/1_tK1mrw.jpg
What stood on this ground before: https://www.chch.live/before?lat=-43.526629799499915&lon=172.59521419947703

Data: https://api.chch.live/report?id=2285928