# Roading/Streets, 477 Main South Road, Canterbury 8042, New Zealand

Christchurch · filed 14 May 2022 · report 2353887
https://www.chch.live/report/2353887

> Light phase for Parker Street has long wait time at peak time, and sensors don't reliably pick up motorbikes.

*The reporter’s own words, a public report relayed, not verified or endorsed.*

## The council’s work orders, near this pin
- Road Asset (e.g.footpathroadfurniture), 1 m away · resolved 11 May 2022, took 8 min, probably the same job, filed through both doors
- Traffic Light, 4 m away · resolved 20 May 2022, took 6 days, probably the same job, filed through both doors
- Road/Hard Surface, 2 m away · resolved 2 Jan 2023, took 1 hours
- Road Works, 2 m away · resolved 29 Jul 2021, took 4 hours
- Traffic Signals, 3 m away · resolved 23 Jul 2025, took 4 days
- Traffic Light, 3 m away · resolved 6 May 2022, took 2 hours
- Traffic Signals, 4 m away · resolved 13 Aug 2025, took 3 hours
- Traffic Signals, 5 m away · resolved 14 Aug 2025, took 20 hours
MyCouncilTicket is a different door from the public report, one job can stand in both streams. The whole roll: https://www.chch.live/fixed

The problem: https://www.chch.live/problems/road-damage
The street: https://www.chch.live/street/hornby/main-south-road
The address: https://www.chch.live/hornby/477-main-south-road
The suburb: https://www.chch.live/hornby
What stood on this ground before: https://www.chch.live/before?lat=-43.54450558467346&lon=172.51627408000314

Data: https://api.chch.live/report?id=2353887
