# Flooding, 1190 Main North Road, Canterbury 8083, New Zealand

Christchurch · filed 18 July 2022 · report 2486954
https://www.chch.live/report/2486954

> Cycleway flooded

*The reporter’s own words, a public report relayed, not verified or endorsed.*

## The council’s work orders, near this pin
- Blocked drain pipe or waterway (Road), 37 m away · resolved 25 Jul 2022, took 23 hours, probably the same job, filed through both doors
- Blocked drain pipe or waterway (Road), 40 m away · resolved 26 Jul 2022, took 26 hours, probably the same job, filed through both doors
- Flooding (Road), 47 m away · resolved 24 Jul 2022, took 23 hours, probably the same job, filed through both doors
- Flooding (Road), 55 m away · resolved 14 Jul 2022, took 4 hours, probably the same job, filed through both doors
- Flooding (Road), 9 m away · resolved 13 Jul 2021, took 3 weeks
- Road Asset (e.g.footpathroadfurniture), 18 m away · resolved 18 Jul 2022, took 4 hours
- Pothole (Road), 19 m away · resolved 8 Apr 2022, took 4 days
- Flooding (Road), 21 m away · resolved 21 Feb 2022, took 16 hours
MyCouncilTicket is a different door from the public report, one job can stand in both streams. The whole roll: https://www.chch.live/fixed

The problem: https://www.chch.live/problems/flooding
The attached photograph: https://snapsendsolve-reports.s3.ap-southeast-2.amazonaws.com/images/02486954/public/1_6qo25ioiks3s.jpg
What stood on this ground before: https://www.chch.live/before?lat=-43.4240605279236&lon=172.65021454491614

Data: https://api.chch.live/report?id=2486954
