# Roading/Streets, Main North Road, Canterbury 8083, New Zealand

Christchurch · filed 19 July 2022 · report 2489076
https://www.chch.live/report/2489076

> This part of the Northern Corridor Cycleway near the Chaneys motorway offramp traffic lights always floods in rain events as the cycleway was build about 200mm too low to prevent the water from the Chaneys offramp flooding the cycleway. Result being that most cyclists take to the grass and destroy the grass. The photo was taken today- a week after the rain event.

*The reporter’s own words, a public report relayed, not verified or endorsed.*

## The council’s work orders, near this pin
- Road Asset (e.g.footpathroadfurniture), 6 m away · resolved 17 Jul 2022, took 30 hours, probably the same job, filed through both doors
- Road Asset (e.g.footpathroadfurniture), 6 m away · resolved 18 Jul 2022, took 4 hours, probably the same job, filed through both doors
- Safety Improvements, 37 m away · resolved 27 Sept 2022, took 2 months, probably the same job, filed through both doors
- Road Asset (e.g.footpathroadfurniture), 55 m away · resolved 25 Jul 2022, took 8 hours, probably the same job, filed through both doors
- Grass (Road), 1 m away · resolved 19 Jul 2022, took 3 hours
- Flooding (Road), 4 m away · resolved 21 Feb 2022, took 16 hours
- Signs, 6 m away · resolved 24 Oct 2024, took 10 days
- Blocked drain pipe or waterway (Road), 11 m away · resolved 11 Dec 2019, took 12 months
MyCouncilTicket is a different door from the public report, one job can stand in both streams. The whole roll: https://www.chch.live/fixed

The problem: https://www.chch.live/problems/road-damage
The street: https://www.chch.live/street/belfast/north-road
The suburb: https://www.chch.live/belfast
The attached photograph: https://snapsendsolve-reports.s3.ap-southeast-2.amazonaws.com/images/02489076/public/1_komWm8v.jpg
What stood on this ground before: https://www.chch.live/before?lat=-43.424254358508975&lon=172.65027690626547

Data: https://api.chch.live/report?id=2489076
