# Pavement - General, 375 Ferry Road, Waltham, Christchurch 8011, New Zealand

Waltham, Christchurch · filed 12 April 2023 · report 3244453
https://www.chch.live/report/3244453

## The council’s work orders, near this pin
- Road/Hard Surface, 60 m away · resolved 17 Apr 2023, took 42 hours, probably the same job, filed through both doors
- Potholes, 60 m away · resolved 13 Apr 2023, took 22 hours, probably the same job, filed through both doors
- Potholes, 65 m away · resolved 20 Apr 2023, took 5 days, probably the same job, filed through both doors
- Graffiti - Utility box, pole, railway, 9 m away · resolved 23 Sept 2024, took 3 days
- Road Works, 10 m away · resolved 8 Jan 2025, took 19 hours
- Found Dog, 15 m away · resolved 19 Apr 2025, took 17 hours
- Graffiti, 15 m away · resolved 15 Jul 2021, took 17 hours
- Water Leak, 16 m away · resolved 16 Dec 2022, took 4 hours
MyCouncilTicket is a different door from the public report, one job can stand in both streams. The whole roll: https://www.chch.live/fixed

The problem: https://www.chch.live/problems/footpaths
The street: https://www.chch.live/street/phillipstown/ferry-road
The address: https://www.chch.live/phillipstown/375-ferry-road
The suburb: https://www.chch.live/phillipstown
What stood on this ground before: https://www.chch.live/before?lat=-43.54221343858411&lon=172.66574096741226

Data: https://api.chch.live/report?id=3244453
