# Graffiti

Christchurch · filed 21 October 2018 · report 525937
https://www.chch.live/report/525937

> On the back of a road works sign

*The reporter’s own words, a public report relayed, not verified or endorsed.*

## The council’s work orders, near this pin
- Graffiti, 3 m away · resolved 13 Nov 2018, took 3 weeks, probably the same job, filed through both doors
- Graffiti, 2 m away · resolved 15 Mar 2022, took 5 hours
- Graffiti, 2 m away · resolved 23 Jul 2020, took 35 hours
- Blocked drain pipe or waterway (Road), 5 m away · resolved 6 Mar 2020, took 8 days
- Blocked drain pipe or waterway (Road), 5 m away · resolved 17 Jul 2020, took 4 weeks
- Litter, 5 m away · resolved 8 Aug 2025, took 45 hours
- Graffiti on Utility box, 5 m away · resolved 22 Jul 2020, took 10 hours
- Graffiti (OLD), 6 m away · resolved 26 Oct 2022, took 4 days
MyCouncilTicket is a different door from the public report, one job can stand in both streams. The whole roll: https://www.chch.live/fixed

The problem: https://www.chch.live/problems/graffiti
The suburb: https://www.chch.live/bryndwr
The attached photograph: https://s3-ap-southeast-2.amazonaws.com/snapsendsolve-reports/images/00525937/0
What stood on this ground before: https://www.chch.live/before?lat=-43.49928678882035&lon=172.58507609361126

Data: https://api.chch.live/report?id=525937
