# Roading/Streets, 275 Barrington St, Spreydon, Christchurch 8024, New Zealand

Spreydon, Christchurch · filed 8 November 2018 · report 539051
https://www.chch.live/report/539051

> Tree overgrown onto bus shelter and in among power lines for fire hazard flash over.

*The reporter’s own words, a public report relayed, not verified or endorsed.*

## The council’s work orders, near this pin
- Street Light, 4 m away · resolved 29 Jan 2019, took 3 months, probably the same job, filed through both doors
- Tree (Road), 1 m away · open, filed 8 Nov 2018
- Street Light, 3 m away · resolved 11 Feb 2019, took 5 hours
- Graffiti on Utility box, 7 m away · resolved 25 Feb 2022, took 9 hours
- Signs, 8 m away · resolved 17 Dec 2025, took 8 months
- Road Layout, 9 m away · resolved 16 Sept 2020, took 14 days
- Leak (Water Supply), 10 m away · resolved 2 Dec 2020, took 29 hours
- Service Lids/Manhole, 10 m away · resolved 27 Sept 2022, took 4 days
MyCouncilTicket is a different door from the public report, one job can stand in both streams. The whole roll: https://www.chch.live/fixed

The problem: https://www.chch.live/problems/road-damage
The street: https://www.chch.live/street/spreydon/barrington-street
The address: https://www.chch.live/spreydon/275-barrington-street
The suburb: https://www.chch.live/spreydon
The attached photograph: https://s3-ap-southeast-2.amazonaws.com/snapsendsolve-reports/images/00539051/0
What stood on this ground before: https://www.chch.live/before?lat=-43.55650349923395&lon=172.61794939962175

Data: https://api.chch.live/report?id=539051
