# Flooding, Montreal Street, Christchurch, 8013, Canterbury

Christchurch · filed 23 November 2018 · report 551661
https://www.chch.live/report/551661

> During recent rainfall I noticed that the construction of the rain garden adjacent to Montreal Street bridge did not allow discharge of water from the channel drain into it. This was due to the edge of the rain garden being constructed higher than the invert of the channel drain. As a result water backed up the channel drain before flooding over the footpath as overland flow.

*The reporter’s own words, a public report relayed, not verified or endorsed.*

## The council’s work orders, near this pin
- Flooding (Park), 10 m away · resolved 29 Nov 2018, took 6 days, probably the same job, filed through both doors
- Council Furniture/Equipment, 4 m away · resolved 7 Sept 2022, took 11 days
- Graffiti on Utility box, 4 m away · resolved 29 Apr 2020, took 6 days
- Graffiti, 7 m away · resolved 30 Apr 2020, took 10 days
- Graffiti on Utility box, 8 m away · resolved 14 Jan 2020, took 10 hours
- Graffiti on Utility box, 8 m away · resolved 26 Dec 2019, took 5 hours
- Graffiti - Utility box, pole, railway, 8 m away · resolved 2 Sept 2024, took 25 hours
- Graffiti on Utility box, 9 m away · resolved 20 Jan 2020, took 1 hours
MyCouncilTicket is a different door from the public report, one job can stand in both streams. The whole roll: https://www.chch.live/fixed

The problem: https://www.chch.live/problems/flooding
The suburb: https://www.chch.live/christchurch-central-city
The attached photograph: https://s3-ap-southeast-2.amazonaws.com/snapsendsolve-reports/images/00551661/0
What stood on this ground before: https://www.chch.live/before?lat=-43.534478332589835&lon=172.63064500060636

Data: https://api.chch.live/report?id=551661
