# Street Gutters / Storm Water, Park Tce near Peterborough St, Canterbury 8013, New Zealand

Christchurch · filed 15 January 2025 · report 5702152
https://www.chch.live/report/5702152

> Water leak filling into a bus stop area within the cycleway.

*The reporter’s own words, a public report relayed, not verified or endorsed.*

## The council’s work orders, near this pin
- Blockage/Water Not Draining, 12 m away · resolved 10 Mar 2025, took 8 weeks, probably the same job, filed through both doors
- Water Leak, 12 m away · resolved 16 Jan 2025, took 22 hours, probably the same job, filed through both doors
- Blockage/Water Not Draining, 14 m away · resolved 13 Jan 2025, took 3 days, probably the same job, filed through both doors
- Blockage/Water Not Draining, 15 m away · resolved 13 Jan 2025, took 26 hours, probably the same job, filed through both doors
- Blockage/Water Not Draining, 15 m away · resolved 14 Jan 2025, took 10 hours, probably the same job, filed through both doors
- Blockage/Water Not Draining, 7 m away · resolved 6 Jan 2025, took 45 hours
- Lighting, 8 m away · resolved 22 Dec 2025, took 4 days
- Sweeping, 8 m away · resolved 5 Dec 2025, took 3 days
MyCouncilTicket is a different door from the public report, one job can stand in both streams. The whole roll: https://www.chch.live/fixed

The problem: https://www.chch.live/problems/stormwater
The suburb: https://www.chch.live/christchurch-central-city
The attached photograph: https://snapsendsolve-reports.s3.ap-southeast-2.amazonaws.com/images/05702152/public/1_pbumr77h5uap.jpg
What stood on this ground before: https://www.chch.live/before?lat=-43.52552999920915&lon=172.62800499944044

Data: https://api.chch.live/report?id=5702152
