# Graffiti on a fence, building or structure, 213 Marine Parade, New Brighton, Christchurch 8061, New Zealand

New Brighton, Christchurch · filed 3 March 2025 · report 5966045
https://www.chch.live/report/5966045

> Tagging in clock tower, different tagging of words and a big penis

*The reporter’s own words, a public report relayed, not verified or endorsed.*

## Also at this address (one of 339)
- [Graffiti on a sign, mural or public art](https://www.chch.live/report/9045890), 7 Oct 2026
- [Pavement - Damaged](https://www.chch.live/report/9015926), 1 Oct 2026
- [Litter](https://www.chch.live/report/8956502), 21 Sept 2026
- [Playground Equipment](https://www.chch.live/report/8925854), 15 Sept 2026
- [Graffiti on a bus stop or public toilet](https://www.chch.live/report/8907245), 12 Sept 2026
- [Graffiti on a fence, building or structure](https://www.chch.live/report/8860892), 3 Sept 2026
- [The address’s whole record](https://www.chch.live/new-brighton/213-marine-parade)

## The council’s work orders, near this pin
- Graffiti - Fence, building or structure, 0 m away · resolved 17 Sept 2025, took 7 months, probably the same job, filed through both doors
- Graffiti - Fence, building or structure, 21 m away · resolved 30 Sept 2026, took 19 months, probably the same job, filed through both doors
- Graffiti - Fence, building or structure, 29 m away · resolved 16 May 2025, took 3 months, probably the same job, filed through both doors
- Graffiti - Fence, building or structure, 33 m away · resolved 17 Sept 2025, took 6 months, probably the same job, filed through both doors
- Graffiti - Fence, building or structure, 40 m away · resolved 30 Sept 2026, took 19 months, probably the same job, filed through both doors
- Graffiti - Fence, building or structure, 48 m away · resolved 6 Mar 2025, took 2 hours, probably the same job, filed through both doors
- Litter, 57 m away · resolved 3 Mar 2025, took 3 hours, probably the same job, filed through both doors
- Graffiti - Fence, building or structure, 60 m away · resolved 26 Feb 2025, took 17 hours, probably the same job, filed through both doors
MyCouncilTicket is a different door from the public report, one job can stand in both streams. The whole roll: https://www.chch.live/fixed

The problem: https://www.chch.live/problems/graffiti
The street: https://www.chch.live/street/new-brighton/marine-parade
The address: https://www.chch.live/new-brighton/213-marine-parade
The suburb: https://www.chch.live/new-brighton
The attached photograph: https://snapsendsolve-reports.s3.ap-southeast-2.amazonaws.com/images/05966045/public/1_3lcymzmuox8l.jpg
What stood on this ground before: https://www.chch.live/before?lat=-43.506737999496686&lon=172.73137199973547

Data: https://api.chch.live/report?id=5966045
