# Roads - General, 39 Gallaghan Cl, Canterbury, Christchurch 8042, New Zealand

Christchurch · filed 29 July 2025 · report 6672222
https://www.chch.live/report/6672222

> Please treat cyclists as transport not pedestrians. Why do straight through cycle traffic not have right if way over the traffic from side streets? Also, why is this a shared pathway with pedestrians when they could be designated the footpath on the other side for exclusive use?

*The reporter’s own words, a public report relayed, not verified or endorsed.*

## The council’s work orders, near this pin
- Safety Improvements, 0 m away · resolved 1 Aug 2025, took 3 days, probably the same job, filed through both doors
- Signs, 13 m away · resolved 1 Nov 2022, took 31 hours
- Litter, 15 m away · resolved 6 Mar 2023, took 3 days
- Flooding (Waste/Storm/Waterway), 24 m away · resolved 9 Jun 2021, took 9 days
- Flooding (Road), 24 m away · resolved 1 Jun 2021, took 6 hours
- Signs, 26 m away · resolved 15 Aug 2022, took 27 min
- Road Asset (e.g.footpathroadfurniture), 29 m away · resolved 14 Nov 2019, took 5 months
- Litter (Road), 30 m away · resolved 13 Mar 2019, took 5 days
MyCouncilTicket is a different door from the public report, one job can stand in both streams. The whole roll: https://www.chch.live/fixed

The problem: https://www.chch.live/problems/road-damage
The street: https://www.chch.live/street/wigram/gallaghan-cl
The address: https://www.chch.live/wigram/39-gallaghan-cl
The suburb: https://www.chch.live/wigram
The attached photograph: https://snapsendsolve-reports.s3.ap-southeast-2.amazonaws.com/images/06672222/public/1_s2uxs2mrxok.jpg
What stood on this ground before: https://www.chch.live/before?lat=-43.55246299868961&lon=172.546064000295

Data: https://api.chch.live/report?id=6672222
