# Flooding, 2, Carrs Road, Halswell, 8025, Canterbury

Halswell, Christchurch · filed 29 April 2019 · report 691307
https://www.chch.live/report/691307

> Surface flooding near corner of Carrs and Awatea Road. Likely needs pumped as nearly covering entire road

*The reporter’s own words, a public report relayed, not verified or endorsed.*

## The council’s work orders, near this pin
- Flooding (Road), 0 m away · open, filed 29 Apr 2019, probably the same job, filed through both doors
- Flooding (Road), 7 m away · resolved 8 Aug 2019, took 3 months, probably the same job, filed through both doors
- Flooding (Road), 4 m away · resolved 1 Apr 2020, took 14 hours
- Flooding (Road), 4 m away · resolved 9 Apr 2019, took 4 days
- Flooding (Road), 6 m away · resolved 8 Aug 2019, took 4 months
- Signs, 6 m away · resolved 29 Mar 2023, took 6 days
- Road Asset (e.g.footpathroadfurniture), 7 m away · resolved 19 Oct 2021, took 2 days
- Pothole (Road), 8 m away · resolved 8 Jun 2021, took 22 hours
MyCouncilTicket is a different door from the public report, one job can stand in both streams. The whole roll: https://www.chch.live/fixed

The problem: https://www.chch.live/problems/flooding
The suburb: https://www.chch.live/wigram
What stood on this ground before: https://www.chch.live/before?lat=-43.56131026304284&lon=172.54995658286495

Data: https://api.chch.live/report?id=691307
