# Road Signage, Memorial Ave near Burnside Park, Canterbury Region 8053, New Zealand

Christchurch · filed 9 October 2025 · report 7011846
https://www.chch.live/report/7011846

> A heap of tape covered up the 6 on the 60kph sign. Probably from the last TTM set up. Please remove from sign

*The reporter’s own words, a public report relayed, not verified or endorsed.*

## The council’s work orders, near this pin
- Signs, 0 m away · resolved 13 Oct 2025, took 4 days, probably the same job, filed through both doors
- Channel/Kerb/Culvert, 21 m away · resolved 22 Sept 2026, took 12 months, probably the same job, filed through both doors
- Blocked drain pipe or waterway (Road), 8 m away · resolved 4 Apr 2022, took 4 hours
- Guard Rails/Barriers, 9 m away · resolved 17 May 2024, took 5 months
- Lighting, 9 m away · resolved 30 Sept 2025, took 13 months
- Trees, 9 m away · resolved 6 Nov 2024, took 4 days
- Litter, 10 m away · resolved 20 Feb 2024, took 26 hours
- Potholes, 10 m away · resolved 22 Mar 2023, took 1 hours
MyCouncilTicket is a different door from the public report, one job can stand in both streams. The whole roll: https://www.chch.live/fixed

The problem: https://www.chch.live/problems/road-damage
The suburb: https://www.chch.live/burnside
The attached photograph: https://snapsendsolve-reports.s3.ap-southeast-2.amazonaws.com/images/07011846/public/1_wid7m3alfwi.jpg
What stood on this ground before: https://www.chch.live/before?lat=-43.50255182781124&lon=172.56471812722603

Data: https://api.chch.live/report?id=7011846
