# Wastewater/Stormwater, 4 Highbank Ln, Mount Pleasant, Christchurch 8081, New Zealand

Mount Pleasant, Christchurch · filed 4 June 2019 · report 722436
https://www.chch.live/report/722436

> over flowing drain

*The reporter’s own words, a public report relayed, not verified or endorsed.*

## The council’s work orders, near this pin
- Blocked drain pipe or waterway (Road), 1 m away · resolved 15 Jan 2020, took 7 months
- Blockage/Water Not Draining, 4 m away · resolved 12 Aug 2025, took 22 hours
- Blocked drain pipe or waterway (Road), 6 m away · resolved 6 Dec 2021, took 41 hours
- Water Leak, 7 m away · resolved 14 Feb 2023, took 5 days
- Litter, 12 m away · resolved 1 Apr 2023, took 26 hours
- Safety Improvements, 16 m away · resolved 11 Apr 2024, took 43 hours
- Blocked drain pipe or waterway (Road), 16 m away · resolved 2 Feb 2022, took 46 hours
- Blocked drain pipe or waterway (Road), 17 m away · resolved 24 Dec 2019, took 24 hours
MyCouncilTicket is a different door from the public report, one job can stand in both streams. The whole roll: https://www.chch.live/fixed

The problem: https://www.chch.live/problems/stormwater
The street: https://www.chch.live/street/mount-pleasant/highbank-lane
The address: https://www.chch.live/mount-pleasant/4-highbank-lane
The suburb: https://www.chch.live/mount-pleasant
The attached photograph: https://s3-ap-southeast-2.amazonaws.com/snapsendsolve-reports/images/00722436/0
What stood on this ground before: https://www.chch.live/before?lat=-43.56423617628158&lon=172.72383615406767

Data: https://api.chch.live/report?id=722436
