# Water Supply

Christchurch · filed 9 July 2019 · report 752542
https://www.chch.live/report/752542

> Submain leak on boundary, 8 Dunn St

*The reporter’s own words, a public report relayed, not verified or endorsed.*

## The council’s work orders, near this pin
- Council Water Supply Issues, 0 m away · resolved 29 Jul 2019, took 3 weeks, probably the same job, filed through both doors
- Leak (Water Supply), 2 m away · resolved 11 Jul 2019, took 6 days, probably the same job, filed through both doors
- Leak (Water Supply), 2 m away · resolved 29 Jul 2019, took 3 weeks, probably the same job, filed through both doors
- Water Leak, 3 m away · resolved 19 Apr 2024, took 12 hours
- Water Meter Box & Parts, 3 m away · resolved 9 Nov 2018, took 2 hours
- Blocked drain pipe or waterway (Road), 5 m away · resolved 12 Jun 2020, took 4 days
- Water Leak, 8 m away · resolved 30 Nov 2025, took 6 hours
- Leak (Water Supply), 8 m away · resolved 30 Jul 2019, took 5 months
MyCouncilTicket is a different door from the public report, one job can stand in both streams. The whole roll: https://www.chch.live/fixed

The problem: https://www.chch.live/problems/water-leaks
The suburb: https://www.chch.live/somerfield
The attached photograph: https://s3-ap-southeast-2.amazonaws.com/snapsendsolve-reports/images/00752542/0
What stood on this ground before: https://www.chch.live/before?lat=-43.55713824423836&lon=172.63140565826126

Data: https://api.chch.live/report?id=752542
