# Flooding, 102 Warrington St, Mairehau, Christchurch 8013, New Zealand

Mairehau, Christchurch · filed 27 August 2019 · report 796773
https://www.chch.live/report/796773

> Does it really take years to fix this shit?

*The reporter’s own words, a public report relayed, not verified or endorsed.*

## The council’s work orders, near this pin
- Water Leak, 7 m away · open, filed 27 Aug 2019, probably the same job, filed through both doors
- Leak (Water Supply), 36 m away · resolved 16 Sept 2019, took 3 weeks, probably the same job, filed through both doors
- Leak (Water Supply), 7 m away · resolved 22 Jun 2019, took 5 days
- Water Leak, 7 m away · open, filed 12 Mar 2019
- Water Leak, 7 m away · open, filed 9 Jun 2019
- Leak (Water Supply), 7 m away · open, filed 9 Jun 2019
- Water Leak, 7 m away · open, filed 24 Jul 2019
- Water Leak, 7 m away · open, filed 23 Mar 2019
MyCouncilTicket is a different door from the public report, one job can stand in both streams. The whole roll: https://www.chch.live/fixed

The problem: https://www.chch.live/problems/flooding
The street: https://www.chch.live/street/edgeware/warrington-street
The address: https://www.chch.live/edgeware/102-warrington-street
The suburb: https://www.chch.live/edgeware
The attached photograph: https://s3-ap-southeast-2.amazonaws.com/snapsendsolve-reports/images/00796773/0_aXfDV1
What stood on this ground before: https://www.chch.live/before?lat=-43.50823978409092&lon=172.64965262250132

Data: https://api.chch.live/report?id=796773
