# Roading/Streets

Christchurch · filed 12 September 2019 · report 813765
https://www.chch.live/report/813765

> Glass at signal in cycle lane

*The reporter’s own words, a public report relayed, not verified or endorsed.*

## The council’s work orders, near this pin
- Spillage - e.g. Fuel Chemicals (Road), 26 m away · resolved 17 Sept 2019, took 40 hours, probably the same job, filed through both doors
- Road Asset (e.g.footpathroadfurniture), 65 m away · resolved 11 Sept 2019, took 5 days, probably the same job, filed through both doors
- Signs, 2 m away · resolved 12 May 2025, took 6 months
- Graffiti, 4 m away · resolved 22 Feb 2022, took 25 hours
- Vehicle, 5 m away · resolved 30 Aug 2019, took 3 days
- Litter (Road), 5 m away · resolved 2 Mar 2022, took 9 days
- Graffiti (OLD), 7 m away · resolved 22 Jan 2024, took 2 days
- Graffiti - Sign, mural or public art, 7 m away · resolved 13 Mar 2025, took 3 days
MyCouncilTicket is a different door from the public report, one job can stand in both streams. The whole roll: https://www.chch.live/fixed

The problem: https://www.chch.live/problems/road-damage
The suburb: https://www.chch.live/waltham
The attached photograph: https://s3-ap-southeast-2.amazonaws.com/snapsendsolve-reports/images/00813765/0_tutzEY
What stood on this ground before: https://www.chch.live/before?lat=-43.542890161470616&lon=172.65584106597785

Data: https://api.chch.live/report?id=813765
