# Water General

Christchurch · filed 13 September 2019 · report 814377
https://www.chch.live/report/814377

> Leaky Toby

*The reporter’s own words, a public report relayed, not verified or endorsed.*

## The council’s work orders, near this pin
- Leak (Water Supply), 15 m away · resolved 30 Sept 2019, took 10 days, probably the same job, filed through both doors
- Leak (Water Supply), 15 m away · resolved 30 Sept 2019, took 3 weeks, probably the same job, filed through both doors
- Sweeping, 3 m away · resolved 24 Nov 2022, took 19 hours
- Road Layout, 3 m away · resolved 28 Aug 2019, took 6 months
- Leak (Water Supply), 5 m away · resolved 29 Mar 2022, took 42 hours
- Litter (Road), 5 m away · resolved 4 Jan 2022, took 4 days
- Manhole, 5 m away · resolved 7 Apr 2022, took 16 min
- Signs, 5 m away · resolved 17 Nov 2022, took 27 hours
MyCouncilTicket is a different door from the public report, one job can stand in both streams. The whole roll: https://www.chch.live/fixed

The problem: https://www.chch.live/problems/water-leaks
The suburb: https://www.chch.live/halswell
The attached photograph: https://s3-ap-southeast-2.amazonaws.com/snapsendsolve-reports/images/00814377/0_QhsusB
What stood on this ground before: https://www.chch.live/before?lat=-43.5768443348792&lon=172.55995009594153

Data: https://api.chch.live/report?id=814377
