# Flooding

Christchurch · filed 16 October 2019 · report 846652
https://www.chch.live/report/846652

> Hi the fall in the gutter is not flowing back to the sump. There is a slump in the gutter levels

*The reporter’s own words, a public report relayed, not verified or endorsed.*

## The council’s work orders, near this pin
- Blocked drain pipe or waterway (Road), 1 m away · resolved 14 May 2020, took 7 months, probably the same job, filed through both doors
- Signs, 2 m away · resolved 20 Feb 2023, took 7 weeks
- Trees, 4 m away · resolved 27 Apr 2023, took 4 weeks
- Footpath, 5 m away · resolved 5 Sept 2022, took 42 hours
- Trees, 5 m away · resolved 21 Feb 2023, took 11 days
- Footpath, 6 m away · resolved 31 Aug 2022, took 38 min
- Graffiti, 6 m away · resolved 24 Jan 2022, took 3 days
- Graffiti, 6 m away · resolved 18 Sept 2019, took 23 hours
MyCouncilTicket is a different door from the public report, one job can stand in both streams. The whole roll: https://www.chch.live/fixed

The problem: https://www.chch.live/problems/flooding
The suburb: https://www.chch.live/saint-albans
The attached photograph: https://s3-ap-southeast-2.amazonaws.com/snapsendsolve-reports/images/00846652/0_fxUa2s
What stood on this ground before: https://www.chch.live/before?lat=-43.50962290246672&lon=172.6300849375233

Data: https://api.chch.live/report?id=846652
