# Road Blockage, 3 Newbridge Pl, Canterbury, Christchurch 8041, New Zealand

Christchurch · filed 26 June 2026 · report 8481045
https://www.chch.live/report/8481045

> Can the reason for this one way system be explained please

*The reporter’s own words, a public report relayed, not verified or endorsed.*

## The council’s work orders, near this pin
- Road Works, 29 m away · resolved 29 Jun 2026, took 2 days, probably the same job, filed through both doors
- Blocked drain pipe or waterway (Road), 18 m away · resolved 27 Aug 2021, took 2 weeks
- Litter, 18 m away · resolved 10 Nov 2024, took 9 days
- Meter box, 18 m away · resolved 2 May 2023, took 38 hours
- Sweeping, 19 m away · resolved 4 Jul 2023, took 5 weeks
- Footpath, 19 m away · resolved 25 Jul 2023, took 3 months
- Blocked drain pipe or waterway (Road), 20 m away · resolved 10 Nov 2021, took 2 months
- Tree (Road), 20 m away · resolved 24 Nov 2021, took 13 days
MyCouncilTicket is a different door from the public report, one job can stand in both streams. The whole roll: https://www.chch.live/fixed

The problem: https://www.chch.live/problems/road-damage
The street: https://www.chch.live/street/ilam/newbridge-place
The address: https://www.chch.live/ilam/3-newbridge-place
The suburb: https://www.chch.live/ilam
The attached photograph: https://snapsendsolve-reports.s3.ap-southeast-2.amazonaws.com/images/08481045/public/1_ll2wfec0hft.jpg
What stood on this ground before: https://www.chch.live/before?lat=-43.51991099920905&lon=172.57669000014297

Data: https://api.chch.live/report?id=8481045
