# Roading/Streets, 202, Saint Asaph Street, Christchurch, 8011, Canterbury

Christchurch · filed 23 October 2019 · report 853712
https://www.chch.live/report/853712

> The new bike parking facilities were built without a lowered kerb. As a result, they are difficult to access with heavier cargo bikes or bike trailers. Even with a regular bike, one needs to come to a complete stop and diamine before accessing the stands. This is quite dangerous with other traffic immediately behind. The kerb needs to be lowered on the cycleway-adjacent side. I am sure this was an oversight during construction, and not intentional.

*The reporter’s own words, a public report relayed, not verified or endorsed.*

## The council’s work orders, near this pin
- Road Layout, 0 m away · resolved 8 Nov 2019, took 2 weeks, probably the same job, filed through both doors
- Signs, 1 m away · resolved 10 Apr 2024, took 3 months
- Graffiti (OLD), 1 m away · resolved 5 Oct 2023, took 43 hours
- Pothole (Road), 2 m away · resolved 19 Feb 2019, took 13 days
- Blockage/Water Not Draining, 2 m away · resolved 17 Oct 2023, took 5 months
- Graffiti, 2 m away · resolved 25 Mar 2019, took 5 hours
- Road Asset (e.g.footpathroadfurniture), 3 m away · resolved 31 Jan 2019, took 2 days
- Spillage Non Toxic, 3 m away · resolved 25 Jun 2024, took 2 weeks
MyCouncilTicket is a different door from the public report, one job can stand in both streams. The whole roll: https://www.chch.live/fixed

The problem: https://www.chch.live/problems/road-damage
The suburb: https://www.chch.live/christchurch-central-city
The attached photograph: https://s3-ap-southeast-2.amazonaws.com/snapsendsolve-reports/images/00853712/0_cwYDFy
What stood on this ground before: https://www.chch.live/before?lat=-43.53643999917046&lon=172.63791000040644

Data: https://api.chch.live/report?id=853712
