# Roading/Streets

Christchurch · filed 6 November 2019 · report 866556
https://www.chch.live/report/866556

> Pothole

*The reporter’s own words, a public report relayed, not verified or endorsed.*

## The council’s work orders, near this pin
- Road Asset (e.g.footpathroadfurniture), 0 m away · resolved 7 Nov 2019, took 26 hours, probably the same job, filed through both doors
- Road Asset (e.g.footpathroadfurniture), 38 m away · resolved 3 Nov 2019, took 12 hours, probably the same job, filed through both doors
- Road Asset (e.g.footpathroadfurniture), 61 m away · resolved 3 Nov 2019, took 13 hours, probably the same job, filed through both doors
- Garden/Landscaped Area, 3 m away · resolved 15 Dec 2023, took 3 months
- Graffiti - Sign, mural or public art, 4 m away · resolved 11 Nov 2024, took 5 days
- Signs (Road), 6 m away · resolved 13 Oct 2020, took 20 hours
- Blockage/Water Not Draining, 6 m away · resolved 6 Jan 2025, took 7 days
- Signs, 6 m away · resolved 10 Jul 2025, took 8 months
MyCouncilTicket is a different door from the public report, one job can stand in both streams. The whole roll: https://www.chch.live/fixed

The problem: https://www.chch.live/problems/road-damage
The suburb: https://www.chch.live/edgeware
The attached photograph: https://s3-ap-southeast-2.amazonaws.com/snapsendsolve-reports/images/00866556/0_7mq1YL
What stood on this ground before: https://www.chch.live/before?lat=-43.51109102249741&lon=172.6460970198132

Data: https://api.chch.live/report?id=866556
