# Flooding, 135–139, Hackthorne Road, Cashmere, 8022, Canterbury

Cashmere, Christchurch · filed 11 November 2019 · report 871536
https://www.chch.live/report/871536

> Blocked drain causing water to run through bus stop opposite Cashmere Primary School

*The reporter’s own words, a public report relayed, not verified or endorsed.*

## The council’s work orders, near this pin
- Blocked drain pipe or waterway (Road), 10 m away · resolved 11 Nov 2019, took 8 hours, probably the same job, filed through both doors
- Signs, 4 m away · resolved 23 Nov 2023, took 10 days
- Road/Hard Surface, 4 m away · resolved 21 Oct 2024, took 11 months
- Blockage/Water Not Draining, 4 m away · resolved 18 Sept 2026, took 22 months
- Blockage/Water Not Draining, 4 m away · resolved 9 Jun 2025, took 27 hours
- Water Leak, 8 m away · resolved 27 Dec 2024, took 3 days
- Lighting, 8 m away · resolved 31 Oct 2025, took 12 months
- Graffiti, 9 m away · resolved 14 Dec 2019, took 19 hours
MyCouncilTicket is a different door from the public report, one job can stand in both streams. The whole roll: https://www.chch.live/fixed

The problem: https://www.chch.live/problems/flooding
The street the pin lands nearest: https://www.chch.live/street/cashmere/dyers-pass-road
The filed address the pin lands 9 m from: https://www.chch.live/cashmere/97-dyers-pass-road
The suburb: https://www.chch.live/cashmere
The attached photograph: https://s3-ap-southeast-2.amazonaws.com/snapsendsolve-reports/images/00871536/0_dgYFnP
What stood on this ground before: https://www.chch.live/before?lat=-43.57689554114761&lon=172.63068414717554

Data: https://api.chch.live/report?id=871536
