# Roading/Streets, 6a Kenilworth Street, Addington, Christchurch 8024, New Zealand

Addington, Christchurch · filed 14 December 2019 · report 910838
https://www.chch.live/report/910838

> Blocking footpath at 5.08pm 14th December 2019

*The reporter’s own words, a public report relayed, not verified or endorsed.*

## The council’s work orders, near this pin
- Vehicle, 1 m away · resolved 16 Dec 2019, took 43 hours, probably the same job, filed through both doors
- Road Layout, 6 m away · resolved 1 Jul 2019, took 4 months
- Water Leak, 8 m away · resolved 5 Jul 2023, took 26 hours
- Water Leak, 8 m away · resolved 4 Jul 2023, took 3 hours
- Water Leak, 13 m away · resolved 22 Feb 2024, took 19 hours
- Road Asset (e.g.footpathroadfurniture), 16 m away · resolved 26 Feb 2020, took 1 hours
- Water Leak, 17 m away · resolved 23 Jul 2023, took 2 days
- Water Leak, 17 m away · resolved 14 Sept 2022, took 6 days
MyCouncilTicket is a different door from the public report, one job can stand in both streams. The whole roll: https://www.chch.live/fixed

The problem: https://www.chch.live/problems/road-damage
The street: https://www.chch.live/street/addington/kenilworth-street
The address: https://www.chch.live/addington/6a-kenilworth-street
The suburb: https://www.chch.live/addington
The attached photograph: https://s3-ap-southeast-2.amazonaws.com/snapsendsolve-reports/images/00910838/0_lAUEnS
What stood on this ground before: https://www.chch.live/before?lat=-43.54226901786465&lon=172.60775450558145

Data: https://api.chch.live/report?id=910838
