# Roading/Streets, 329–465, McQueens Valley Road, Gebbies Valley, 7672, Canterbury

Gebbies Valley, Christchurch · filed 21 January 2020 · report 951189
https://www.chch.live/report/951189

> Previously reported potholes now deeper and bigger.

*The reporter’s own words, a public report relayed, not verified or endorsed.*

## The council’s work orders, near this pin
- Banks Peninsula Pothole (Road), 1 m away · resolved 16 Jun 2020, took 5 months, probably the same job, filed through both doors
- Banks Peninsula Pothole (Road), 1 m away · resolved 19 Jun 2019, took 42 hours
- Banks Peninsula Pothole (Road), 14 m away · resolved 19 Jun 2019, took 42 hours
- Banks Peninsula Pothole (Road), 54 m away · resolved 20 Mar 2020, took 4 months
- Banks Peninsula Pothole (Road), 56 m away · resolved 6 Feb 2020, took 3 months
- Temporary Traffic Management, 84 m away · resolved 2 Sept 2019, took 4 days
- Trees, 108 m away · resolved 18 Aug 2023, took 9 days
- Blocked drain pipe or waterway (Road), 122 m away · resolved 3 Aug 2020, took 5 weeks
MyCouncilTicket is a different door from the public report, one job can stand in both streams. The whole roll: https://www.chch.live/fixed

The problem: https://www.chch.live/problems/road-damage
The suburb: https://www.chch.live/gebbies-valley
The attached photograph: https://s3-ap-southeast-2.amazonaws.com/snapsendsolve-reports/images/00951189/0_wmAuSP
What stood on this ground before: https://www.chch.live/before?lat=-43.70796999945385&lon=172.65202166964488

Data: https://api.chch.live/report?id=951189
