# Roading/Streets, 151, Shaw Avenue, New Brighton, 8083, Canterbury

New Brighton, Christchurch · filed 22 January 2020 · report 952911
https://www.chch.live/report/952911

> Collapsed path and broken crossing could be replaced or removed

*The reporter’s own words, a public report relayed, not verified or endorsed.*

## The council’s work orders, near this pin
- Road Asset (e.g.footpathroadfurniture), 0 m away · resolved 12 Oct 2020, took 9 months, probably the same job, filed through both doors
- Graffiti, 4 m away · resolved 15 Jan 2021, took 37 hours
- Blocked drain pipe or waterway (Road), 5 m away · resolved 19 May 2021, took 23 hours
- Signs (Road), 6 m away · resolved 16 Jan 2020, took 22 hours
- Graffiti, 9 m away · resolved 19 Jan 2021, took 47 hours
- Flooding (Road), 10 m away · resolved 1 Jun 2019, took 54 min
- Service Lids/Manhole, 10 m away · resolved 25 Feb 2025, took 12 days
- Flooding (Road), 12 m away · resolved 30 Apr 2019, took 14 hours
MyCouncilTicket is a different door from the public report, one job can stand in both streams. The whole roll: https://www.chch.live/fixed

The problem: https://www.chch.live/problems/road-damage
The street the pin lands nearest: https://www.chch.live/street/new-brighton/shaw-avenue
The filed address the pin lands 5 m from: https://www.chch.live/new-brighton/153-shaw-avenue
The suburb: https://www.chch.live/new-brighton
The attached photograph: https://s3-ap-southeast-2.amazonaws.com/snapsendsolve-reports/images/00952911/0_yR6u22
What stood on this ground before: https://www.chch.live/before?lat=-43.50449892565237&lon=172.72530083872263

Data: https://api.chch.live/report?id=952911
