# Roading/Streets, Kirk Road, Templeton, Christchurch 7675, New Zealand

Templeton, Christchurch · filed 5 February 2020 · report 969473
https://www.chch.live/report/969473

> Most of Kirk Rd is has temporary 50kmh signs but no indication of roadworks or workers or why speed is reduced. on the northbound side, there is a 30kmh sign leading to a covered 80kmh sign next to an uncovered 80kmh sign. on the south bound side it is there is about 50mtrs of 30kmh zone before entering the Templeton 50kmh zone. The whole site is a joke and no one is complying with posted limits, temporary or otherwise.

*The reporter’s own words, a public report relayed, not verified or endorsed.*

## The council’s work orders, near this pin
- Potholes, 19 m away · resolved 29 May 2025, took 14 hours
- Water Supply, 148 m away · resolved 13 Jan 2025, took 18 hours
MyCouncilTicket is a different door from the public report, one job can stand in both streams. The whole roll: https://www.chch.live/fixed

The problem: https://www.chch.live/problems/road-damage
The suburb: https://www.chch.live/templeton
The attached photograph: https://s3-ap-southeast-2.amazonaws.com/snapsendsolve-reports/images/00969473/0_xCuaFV
What stood on this ground before: https://www.chch.live/before?lat=-43.54134671064732&lon=172.4648638446002

Data: https://api.chch.live/report?id=969473
