Reported Friday, 29 January 2016 at 7:09 pm.
The reporter’s words
The laying of UFB cables in the footpath by Vodafone contractors has affected my vehicle crossing, there is now a significant mismatch and drop off to access my property. This is the second submission I have made with no response! The suspension of my vehicles is being stressed by the poor remediation works when the footpath was repaired by the contractors.
The filing
- Filed
- Friday, 29 January 2016 at 7:09 pm
- Report number
- #116,135
- Filed under
- roads
- Coordinates
- the pin on the map →
The council’s work orders, near this pin
- Hazard/Object in Road0 m away · resolved 10 Dec 2024, took 9 days
- Safety Improvements6 m away · resolved 28 Mar 2025, took 6 weeks
- Road Layout7 m away · resolved 12 Feb 2021, took 3 months
- Blockage/Water Not Draining7 m away · resolved 18 Jul 2025, took 3 days
- Road Asset (e.g.footpathroadfurniture)8 m away · resolved 17 Sept 2019, took 4 days
- Spillage - e.g. Fuel Chemicals (Road)9 m away · resolved 26 Feb 2019, took 16 hours
- Blocked drain pipe or waterway (Road)9 m away · resolved 2 Nov 2021, took 5 weeks
- Blockage/Water Not Draining11 m away · resolved 20 Feb 2024, took 4 weeks
MyCouncilTicket is the council’s own work-order stream, a different door from the public report above, and the same job can stand in both. The whole ticket roll →
Where this sits
The suburbthe suburb, in depthThe problemRoading/Streetsevery filing of its kind on the city’s booksThe date29 Januarythis date in the archive, across the yearsThe year2016the year’s shelf and ledgerThe mapOn the mapthe pin, among its neighboursBeforeWhat stood herewhat the archive knows of this ground
The feed listed this report when a sweep caught it 5 Sept 2026, it has not been listed since. The record here does not move.