chch.live one report, whole

Roading/Streets

Reported Friday, 29 January 2016 at 7:09 pm.

The photograph attached to this roading/streets report
The photograph the reporter attached, on the wall with the rest.

The reporter’s words

The laying of UFB cables in the footpath by Vodafone contractors has affected my vehicle crossing, there is now a significant mismatch and drop off to access my property. This is the second submission I have made with no response! The suspension of my vehicles is being stressed by the poor remediation works when the footpath was repaired by the contractors.

The filing

Filed
Friday, 29 January 2016 at 7:09 pm
Report number
#116,135
Filed under
roads
Coordinates
the pin on the map →

The council’s work orders, near this pin

MyCouncilTicket is the council’s own work-order stream, a different door from the public report above, and the same job can stand in both. The whole ticket roll →

Where this sits

The feed listed this report when a sweep caught it 5 Sept 2026, it has not been listed since. The record here does not move.