chch.live one report, whole

Water General

Reported Monday, 6 May 2024 at 11:40 am, 56 Glenroy Street, Woolston, Christchurch 8062, New Zealand.

The photograph attached to this water general report
The photograph the reporter attached, on the Woolston wall with the rest.

The reporter’s words

The exiting DN300 CLS pipeline found slow leaking from the joint with a Gibualt. Currently this area been hydro excavated for laying the Od355 scour pipeline towards woolston pump station. Can you please send someone from maintains to have a look? Hopefully can get it fixed while the trench still open.

The filing

Filed
Monday, 6 May 2024 at 11:40 am
Report number
#4,626,698
Filed under
water
Coordinates
the pin on the map →

Also at this address one of 11

The address’s whole record →

The council’s work orders, near this pin

MyCouncilTicket is the council’s own work-order stream, a different door from the public report above, and the same job can stand in both. The whole ticket roll →

Where this sits

The feed listed this report when a sweep caught it 6 Sept 2026, it has not been listed since. The record here does not move.