chch.live one report, whole

Pavement - General

Reported Friday, 25 April 2025 at 6:48 pm, 240A Waltham Rd, Canterbury, Christchurch 8023, New Zealand.

The photograph attached to this pavement - general report
The photograph the reporter attached, on the wall with the rest.

The reporter’s words

Hi, this needs to have a smooth transition from the bridge down to the on road cycle way as it is quite? a bumpy and difficult transition currently. If you don’t come in at the right angle there is a possibility of losing control . Could this be looked into and possibly some extra tarmac added to smooth out the transition between the bridge and the road. Thanks.

The filing

Filed
Friday, 25 April 2025 at 6:48 pm
Report number
#6,241,643
Filed under
roads
Coordinates
the pin on the map →

Also at this address one of 2

The address’s whole record →

The council’s work orders, near this pin

MyCouncilTicket is the council’s own work-order stream, a different door from the public report above, and the same job can stand in both. The whole ticket roll →

Where this sits

The feed listed this report when a sweep caught it 6 Sept 2026, it has not been listed since. The record here does not move.