chch.live one report, whole

Pavement - General

Reported Thursday, 26 February 2026 at 9:55 am, 1 Hackthorne Road, Cashmere, Christchurch 8022, New Zealand.

The photograph attached to this pavement - general report
The photograph the reporter attached, on the Cashmere wall with the rest.

The reporter’s words

A section of footpath outside 1 Hackthorne Road needs some form of safety rail due to a steep drop off into the property. The steep drop is a hazard for pedestrians and children on scooters etc. The area currently has danger tape attached to a road cone but ths is not a satisfactory long term solution. Also attached is a pic of a CCC safety rail directly across the road.

The filing

Filed
Thursday, 26 February 2026 at 9:55 am
Report number
#7,809,768
Filed under
roads
Coordinates
the pin on the map →

Also at this address one of 10

The address’s whole record →

The council’s work orders, near this pin

MyCouncilTicket is the council’s own work-order stream, a different door from the public report above, and the same job can stand in both. The whole ticket roll →

Where this sits

The feed listed this report when a sweep caught it 6 Sept 2026, it has not been listed since. The record here does not move.